Why this workflow matters

For northern-hemisphere projects, materially north-facing terrain can reduce solar access and complicate row geometry, tracker operation and grading. A screening rule can protect early capacity estimates from obviously adverse cells.

Questions to answer

  • Which downslope aspects are classified as north-facing?
  • What slope threshold matches the preliminary technology?
  • Are excluded areas contiguous or fragmented?
  • Could detailed design recover some land safely?

Recommended workflow

  1. 1Calculate slope and downslope aspect from terrain samples.
  2. 2Apply the documented, user-selected slope and north-sector assumption.
  3. 3Dissolve qualifying cells into preliminary terrain-mask boundaries.
  4. 4Validate with higher-resolution terrain and technology-specific layout studies.

Evidence to collect

  • Elevation grid and calculation method
  • Aspect convention and threshold
  • Mapped exclusion boundary
  • Tracker or fixed-tilt design criteria

Decision-ready outputs

  • North-slope affected-area percentage
  • Continuous preliminary exclusion boundary