Public concept tool
BESS concept sizing with visible assumptions
Turn a power and usable-energy requirement into a preliminary duration, installed-energy basis, container count and throughput estimate.
Concept inputs
Screening result
Discharge duration
4.00 h
Required beginning-of-life AC usable energy
275.0 MWh
Indicative containers
55
Annual delivered energy
60000 MWh
Annual charging energy
68182 MWh
Indicative equipment area
6,600 m²
Energy is measured at the same AC connection point. Duration = required delivered energy ÷ discharge power. Beginning-of-life usable energy = required end-of-life delivered energy × (1 + reserve) ÷ retention; containers are rounded up. Annual delivered energy = required delivered energy × full cycles; charging energy = delivered energy ÷ round-trip efficiency. This is a constant-duty annual estimate, not a degradation forecast. Use AC usable container ratings on this same basis, not DC nameplate ratings.
Concept-level only. The area basis assumes 120 m² per container including preliminary spacing and access. Confirm degradation, augmentation, fire strategy, auxiliary loads, grid-code duty and vendor configuration before design or investment decisions.