SolarDev AI · fictional sample
Preliminary screening-index report
Illustrative Iberian candidate
- Screening index
- 72/100
- Source coverage
- 75%
- Gross area
- 50.0 ha
- Perimeter
- 3.1 km
Development-envelope assumptions
- Gross boundary
- 50.0 ha
- Selected north-facing terrain mask
- −6.0 ha
- Other land allowance at 15%
- −6.6 ha
- Indicative usable-area assumption
- 37.4 ha
- Indicative DC capacity at 0.65 MWp/ha
- 24.3 MWp
- Indicative AC capacity at 1.25 DC/AC
- 19.4 MW
- Illustrative production at 1,600 kWh/kWp
- 38.9 GWh/year
Criterion evidence
Natura 2000
No mapped overlap returnedEEA example response · national verification still required
Flood reporting context
Further review requiredFictional reporting-area intersection · not an inundation map
Terrain assumption
6.0 ha preliminary maskNorth-facing cells above a selected 5° threshold · source-reported DEM resolution
Grid context
UnconfirmedMapped assets only · no operator capacity or connection offer